Posted by : at

Category : engineering

Finally all my networking hardware, servers and UPS are in the same place. I also did some cable management, but since I’m trying to do this in an old cabinet it is quite difficult to make is both accessible and beautiful.

Part 2: Building my Homelab – part 2

Parts used:

The main change is the addition of Tesla, a server powered by an Intel i5-2400S (for power efficiency), with 8 GB of RAM, 1 TB of Raid 1 (ZFS) storage space and 600 GB of WD Black used for a Proxmox install and maybe VM scratch space. An article about it will soon follow.

Main changes:

  • Cable management
  • Took Hydra offline
  • Built Tesla to take its place
  • LEDs offline for now
  • Tidying up